Plymouth Branch Construction Progress
- Former Boardroom
- Lobby Demolition
- Waiting room looking at boardroom
- The former board room wall and inside looking at the entrance.
- Inside the boardroom, back to Joy Road.
- Former offices
- Open air lobby
- Former Waiting Room
- The former kid and waiting area.
- Old lobby demolition looking at MSR office
- Boardroom walls no more
- Boardroom wall
- Small Office
- Corner of former office
- New technology area
- ITM area
- Open air lobby area
- Coffee bar and plenty of seating
- New staff entrance from lobby
- ITM area, staff entrance
- Video Wall
- Small Office
- Coffee Bar Walls
- Open Lobby Concept
- Video Wall
- Dedicated ITM area
- Staff Entrance, Office
- Conference Room Wall
- Staff Entrance/Office Area
- ITM Area
- Video Wall
- Open Lobby Area
- Coffee Bar
- Lobby Area
- Coffee Bar taking shape
- Open-Air Lobby
- Along video wall
- Lobby
- ITM area
- Small Conference Room
- Small Office
- ITM area
- video wall
- Ceiling is making progress
- Sitting area ceiling
- Lobby from Office
- ITM area
- From Entrance
- Coffee Area
- Lobby Area Clouds
- Back wall of ITM area
- Fancy lighting in lobby area
- New counter in conference room
- ITM area
- Counter top and lighting above coffee bar
- Coffee Bar with backsplash
- Glass walls installed (Taped for safety)
- Lighting and both ITMs installed
- Video Wall – awaiting wallpaper
- Furniture Delivery
- Furniture Unpacking
- Video/Accent Wallcovering
- In-Branch Office
- Conference Room
- Lobby Furniture
- Wallcovering
- Full Lobby
- Coffee Bar
- Tech Table